Opening ceremony for DACHSER’s new high-bay warehouse in Memmingen
Construction for the new logistics facility started in spring 2021. It consists of a front building with 2,700 m² of floor space and an adjacent high-bay warehouse that provides 7,500 m² of logistics space. At 32 meters tall, the storage facility covers only a small area but provides space for 52,000 pallets of non-chilled food and food packaging. It also features a mezzanine with 2,300 m² of floor space for manual picking and finishing operations.
DACHSER’s Allgäu logistics center is the company’s largest operational location worldwide. With the new logistics facility now in operation, the family-owned company offers a total of more than 200,000 pallet spaces in Memmingen.
“The new warehouse is designed to offer top performance to keep pace with growing customer demand in the region,” explains Thomas Henkel, General Manager of DACHSER’s Allgäu logistics center in Memmingen. “Automation and sustainability were the main focus when building it.” Storage and retrieval of pallets, for example, is fully automated. As many as 400 pallets per hour—or 5,000 per day—of incoming and outgoing goods can be handled via 22 loading and unloading gates. This is made possible by features such as automatic unloading systems, an automatic palletizing station, and eight rail-guided rack operators in high-bay storage.
“For DACHSER, the high-bay warehouse in Memmingen is one of the most important new facility projects of the past few years. It brings together state-of-the-art automation technology and the latest sustainability concepts based on the accumulated expertise of our network and our employees,” says DACHSER CEO Burkhard Eling. “This investment benefits not only the Memmingen location but also the DACHSER company as a whole.”